Project
|
To
strip out the shop and the basement complete, to plaster
set all walls and some sections of ceilings, leaving decorative
and ornate ceilings in place but carrying out minor fibre
and plaster repairs. To re-wire the property complete to
IEE regulations 16th edition. To refit all toilet areas complete,
to fit kitchen area complete. To supply all necessary services
including gas (Corgy). To tile basement floor throughout
to include toilet area, lobby, landings etc. To decorate
throughout. To construct display unit situated on the first
floor, said display unit projecting to the external section
of the building with all necessary steel and cantilever supports
etc. To create and install vanity area for ladies toilets,
to include all floor and wall tiling and mirrors etc. To
install vinyl floors to both sets of stairs. To construct
display counters and main serving areas, finsihed in black
speckled granite and to clad all frontage of service counters
with reconstituted stone. To install oak flooring, polished
and finished. To install various design mirrors, finished
with oak framing. To supply and install display stands, shelvings
etc manufactured from oak. To install specialist lighting
systems (IEE) and to decorate throughout to clients choice.
|