Project
|
The
project consisted in stripping out the existing internal
units and flooring complete, to construct new units to new
layout of solid block work. To install internal roofs to
each unit for storage and to supply and install shop frontages.
To install security roller shutters to each unit, to supply
and install all necessary electrics (IEE), to include 3 phase.
To prepare complete flooring throughout and to supply and
install Karndean flooring. To construct external electrical
metre cupboard and construct and install conservatory, all
spray finished with architectural solignum, fixed to pre-constructed
raft. To construct new entrance porch, predominantly out
of oak, fixed on York stone basis. To extend the existing
cafe to link with the market hall, constructed from block
work and fare faced brickwork to match existing, set on a
reinforced concrete raft. To strip out the coffee shop complete
and to construct toilet areas, male and female and a kitchen
area and to fitout. To construct an entrance linkway between
the coffee shop and the market hall and second main entrance
to the market hall.
The
main entrance is predominantly formed out of oak cladding
steel frame work set on York stone basis. To supply and install
hexagonal glazed features to teh coffee shop so as to provide
complete glazed walls on three sides. To install floor tiles
within the kitchen area and coffee shop area and to re-wire
to IEE regulations to include 3 phase supply and to supply
and install necessary other services to include gas for kitchen.
To plaster finish and decorate throughout to the appropriate
finishes.
|